Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    A new way to test how well AI systems classify text | MIT News

    August 13, 2025

    Applications Now Open for $60,000 NVIDIA Graduate Fellowship Awards

    August 13, 2025

    Appeals court ruling will let Trump administration cut billions in foreign aid

    August 13, 2025
    Facebook X (Twitter) Instagram
    • Demos
    • Buy Now
    Facebook X (Twitter) Instagram YouTube
    14 Trends14 Trends
    Demo
    • Home
    • Features
      • View All On Demos
    • Buy Now
    14 Trends14 Trends
    Home » Big Tech wants to plug data centers right into power plants. Utilities say it’s not fair
    Technology

    Big Tech wants to plug data centers right into power plants. Utilities say it’s not fair

    adminBy adminJanuary 27, 2025No Comments6 Mins Read0 Views
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    HARRISBURG, Pa. — Looking for a quick fix for their fast-growing electricity diets, tech giants are increasingly looking to strike deals with power plant owners to plug in directly, avoiding a potentially longer and more expensive process of hooking into a fraying electric grid that serves everyone else.

    It’s raising questions over whether diverting power to higher-paying customers will leave enough for others and whether it’s fair to excuse big power users from paying for the grid. Federal regulators are trying to figure out what to do about it, and quickly.

    Front and center is the data center that Amazon’s cloud computing subsidiary, Amazon Web Services, is building next to the Susquehanna nuclear plant in eastern Pennsylvania.

    The arrangement between the plant’s owners and AWS — called a “behind the meter” connection — is the first such to come before the Federal Energy Regulatory Commission. For now, FERC has rejected a deal that could eventually send 960 megawatts — about 40% of the plant’s capacity — to the data center. That’s enough to power more than a half-million homes.

    That leaves the deal and others that likely would follow in limbo. It’s not clear when FERC, which blocked the deal on a procedural ground, will take up the matter again or how the change in presidential administrations might affect things.

    “The companies, they’re very frustrated because they have a business opportunity now that’s really big,” said Bill Green, the director of the MIT Energy Initiative. “And if they’re delayed five years in the queue, for example — I don’t know if it would be five years, but years anyway — they might completely miss the business opportunity.”

    The rapid growth of cloud computing and artificial intelligence has fueled demand for data centers that need power to run servers, storage systems, networking equipment and cooling systems.

    That’s spurred proposals to bring nuclear power plants out of retirement, develop small modular nuclear reactors and build utility-scale renewable installations or new natural gas plants. In December, California-based Oklo announced an agreement to provide 12 gigawatts to data center developer Switch from small nuclear reactors powered by nuclear waste.

    Federal officials say fast development of data centers is vital to the economy and national security, including to keep pace with China in the artificial intelligence race.

    For AWS, the deal with Susquehanna satisfies its need for reliable power that meets its internal requirements for sources that don’t emit planet-warming greenhouse gases, like coal, oil or gas-fueled plants.

    Big Tech also wants to stand up their centers fast. But tech’s voracious appetite for energy comes at a time when the power supply is already strained by efforts to shift away from planet-warming fossil fuels.

    They can build data centers in a couple years, said Aaron Tinjum of the Data Center Coalition. But in some areas, getting connected to the congested electricity grid can take four years, and sometimes much more, he said.

    Plugging directly into a power plant would take years off their development timelines.

    In theory, the AWS deal would let Susquehanna sell power for more than they get by selling into the grid. Talen Energy, Susquehanna’s majority owner, projected the deal would bring as much as $140 million in electricity sales in 2028, though it didn’t disclose exactly how much AWS will pay for the power.

    The profit potential is one that other nuclear plant operators, in particular, are embracing after years of financial distress and frustration with how they are paid in the broader electricity markets. Many say they have been forced to compete in some markets against a flood of cheap natural gas as well as state-subsidized solar and wind energy.

    Power plant owners also say the arrangement benefits the wider public, by bypassing the costly buildout of long power lines and leaving more transmission capacity on the grid for everyone else.

    A favorable ruling from FERC could open the door to many more huge data centers and other massive power users like hydrogen plants and bitcoin miners, analysts say.

    FERC’s 2-1 rejection in November was procedural. Recent comments by commissioners suggest they weren’t ready to decide how to regulate such a novel matter without more study.

    In the meantime, the agency is hearing arguments for and against the Susquehanna-AWS deal.

    Monitoring Analytics, the market watchdog in the mid-Atlantic grid, wrote in a filing to FERC that the impact would be “extreme” if the Susquehanna-AWS model were extended to all nuclear power plants in the territory.

    Energy prices would increase significantly and there’s no explanation for how rising demand for power will be met even before big power plants drop out of the supply mix, it said.

    Separately, two electric utility owners — which make money in deregulated states from building out the grid and delivering power — have protested that the Susquehanna-AWS arrangement amounts to freeloading off a grid that ordinary customers pay to build and maintain. Chicago-based Exelon and Columbus, Ohio-based American Electric Power say the Susquehanna-AWS arrangement would allow AWS to avoid $140 million a year that it would otherwise owe.

    Susquehanna’s owners say the data center won’t be on the grid and question why it should have to pay to maintain it. But critics contend that the power plant itself is benefiting from taxpayer subsidies and ratepayer-subsidized services, and shouldn’t be able to strike deals with private customers that could increase costs for others.

    FERC’s decision will have “massive repercussions for the entire country” because it will set a precedent for how FERC and grid operators will handle the waiting avalanche of similar requests from data center companies and nuclear plants, said Jackson Morris of the Natural Resources Defense Council.

    Stacey Burbure, a vice president for American Electric Power, told FERC at a hearing in November that it needs to move quickly.

    “The timing of this issue is before us,” she said, “and if we take our typical five years to get this perfect, it will be too late.”

    ___

    Follow Marc Levy on X at: https://x.com/timelywriter.

    ___

    The Associated Press’ climate and environmental coverage receives financial support from multiple private foundations. AP is solely responsible for all content. Find AP’s standards for working with philanthropies, a list of supporters and funded coverage areas at AP.org.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    admin
    • Website

    Related Posts

    Which choices contribute most to climate change? Most people miss the mark, one study found

    August 13, 2025

    Trump says Intel CEO has an ‘amazing story’ days after calling for his resignation

    August 13, 2025

    Trump says Intel CEO has an ‘amazing story’ days after calling for his resignation

    August 13, 2025

    Epic Games wins partial victory in Australian court against Google and Apple

    August 13, 2025

    Epic Games wins partial victory in Australian court against Google and Apple

    August 12, 2025

    Scientists standing by to rescue rare manatee sighted in cold New England waters

    August 12, 2025
    Leave A Reply Cancel Reply

    Demo
    Top Posts

    ChatGPT’s viral Studio Ghibli-style images highlight AI copyright concerns

    March 28, 20254 Views

    Best Cyber Forensics Software in 2025: Top Tools for Windows Forensics and Beyond

    February 28, 20253 Views

    An ex-politician faces at least 20 years in prison in killing of Las Vegas reporter

    October 16, 20243 Views

    Laws, norms, and ethics for AI in health

    May 1, 20252 Views
    Don't Miss

    A new way to test how well AI systems classify text | MIT News

    August 13, 2025

    Is this movie review a rave or a pan? Is this news story about business…

    Applications Now Open for $60,000 NVIDIA Graduate Fellowship Awards

    August 13, 2025

    Appeals court ruling will let Trump administration cut billions in foreign aid

    August 13, 2025

    Applications Now Open for $60,000 NVIDIA Graduate Fellowship Awards

    August 13, 2025
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    Demo
    Top Posts

    ChatGPT’s viral Studio Ghibli-style images highlight AI copyright concerns

    March 28, 20254 Views

    Best Cyber Forensics Software in 2025: Top Tools for Windows Forensics and Beyond

    February 28, 20253 Views

    An ex-politician faces at least 20 years in prison in killing of Las Vegas reporter

    October 16, 20243 Views
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Demo
    About Us
    About Us

    Your source for the lifestyle news. This demo is crafted specifically to exhibit the use of the theme as a lifestyle site. Visit our main page for more demos.

    We're accepting new partnerships right now.

    Email Us: info@example.com
    Contact: +1-320-0123-451

    Facebook X (Twitter) Pinterest YouTube WhatsApp
    Our Picks

    A new way to test how well AI systems classify text | MIT News

    August 13, 2025

    Applications Now Open for $60,000 NVIDIA Graduate Fellowship Awards

    August 13, 2025

    Appeals court ruling will let Trump administration cut billions in foreign aid

    August 13, 2025
    Most Popular

    ChatGPT’s viral Studio Ghibli-style images highlight AI copyright concerns

    March 28, 20254 Views

    Best Cyber Forensics Software in 2025: Top Tools for Windows Forensics and Beyond

    February 28, 20253 Views

    An ex-politician faces at least 20 years in prison in killing of Las Vegas reporter

    October 16, 20243 Views

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    14 Trends
    Facebook X (Twitter) Instagram Pinterest YouTube Dribbble
    • Home
    • Buy Now
    © 2025 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.